Roche Diagnostics
94 Instructions for Use · Version 10.0
6 Installation and shutdown 9180 Electrolyte Analyzer
Shutdown
3. Washing the lines
The analyzer will take approximately one minute to flush all lines with water. Upon
completion, you will receive the prompt Remove Water and press YES.
o Remove the line with the blue mark from the distilled water and place it on a
cloth.
u Figure 6-22 (p. 94).
o Press YES. During this cycle, all lines are washed with distilled water.
o Upon completion, All Electrodes & Plug Removed? will be displayed.
Figure 6-22
4. Removing the electrodes and the shutdown plug
o Remove the shutdown plug from the SnapPak receptacle.
o Unplug the reference connector below the left side of the electrode holder.
o Move the lever on the left side forward and remove all electrodes, placing them on
a soft cloth.
o Move the lever back and push the empty electrode holder into its back position.
o Unscrew the transport housing from the reference housing.
u See the Use and care sections of Electrode specifications (p. 57)
o Empty the reference housing and place all electrodes into their protective boxes.
o Press YES.
Figure 6-23
A Line with the blue mark
A