EasyManua.ls Logo

Roche 9180 - Installing the Relief Clamps and Removing the Pump Windings

Roche 9180
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
Instructions for Use · Version 10.0 95
9180 Electrolyte Analyzer 6 Installation and shutdown
Shutdown
5. Installing the relief clamps and removing the pump windings
The display will prompt All 5 Relief Clamps Inserted?
o Install the red relief clamps making sure that they are snapped securely into
position.
Figure 6-24
The relief clamps can be installed at the following positions:
O A
O B
O C
O V
O R
o Press YES.
q
Do not insert the solenoid relief clamps with the SnapPak in place.
o The prompt Pump Windings Relieved? appears.
o Grasp the front winding close to the pump roller and gently pull it off the roller.

Table of Contents

Related product manuals