MAINTENANCE MANUAL
MAINTENANCE SCHEDULE
Perform the following maintenance tasks at the intervals shown in the maintenance check list.
See Chapter 05-20-00 section 25 hr. check.
Legend: X
=
do the task
blank
=
no task required
NNOOTTEE
If the points 1-4 are correct of the check list then to continue with the maintenance schedule.
If one of the points 1-4 is not fulfilled, the engine must be checked and repaired in accordance with
the BRP-Rotax instructions for continued airworthiness.
Points of Inspection
Interval Operating hours Chapter
Reference
Signa-
ture
* no periodic maintenance (require-
ment after the first 25 hours of
operation)
25* 50 100 200 600 1000
1) General note
All (Alert) Service Bulletins are com-
plied with. If necessary to perform
these and documented.
X X X X X X
All SI-PAC (Service Instruction Part
and Accessories) for additional GENU-
INE-ROTAX®- parts and accessories
used on the relevant aircraft are com-
plied with. If necessary to perform
these and document it.
X X X X X X
2) Differential pressure check
Check the compression by the differen-
tial pressure method.
Test pressure________hPa (psi)
Pressure drop (% or fraction)
Cyl. #
1 2 3 4
bar/
psi
(2
use of leaded fuel more than 30% of
operation
X
(2
X X X 12–20–00
Checking the
compression
05–20–00
Page 8
December 01 2017
Effectivity: 915 i A Series
Edition 0/Rev. 0

Table of Contents

Other manuals for Rotax 915 i A SERIES

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotax 915 i A SERIES and is the answer not in the manual?

Rotax 915 i A SERIES Specifications

General IconGeneral
BrandRotax
Model915 i A SERIES
CategoryEngine
LanguageEnglish

Related product manuals