EasyManua.ls Logo

Rotax 915 i A SERIES - Maintenance Schedule

Rotax 915 i A SERIES
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRP-Rotax
MAINTENANCE MANUAL
MAINTENANCE SCHEDULE
Perform the following maintenance tasks at the intervals shown in the maintenance check list.
See Chapter 05-20-00 section 25 hr. check.
Legend: X
=
do the task
blank
=
no task required
NNOOTTEE
If the points 1-4 are correct of the check list then to continue with the maintenance schedule.
If one of the points 1-4 is not fulfilled, the engine must be checked and repaired in accordance with
the BRP-Rotax instructions for continued airworthiness.
Points of Inspection
Interval Operating hours Chapter
Reference
Signa-
ture
* no periodic maintenance (require-
ment after the first 25 hours of
operation)
25* 50 100 200 600 1000
1) General note
All (Alert) Service Bulletins are com-
plied with. If necessary to perform
these and documented.
X X X X X X
All SI-PAC (Service Instruction Part
and Accessories) for additional GENU-
INE-ROTAX®- parts and accessories
used on the relevant aircraft are com-
plied with. If necessary to perform
these and document it.
X X X X X X
2) Differential pressure check
Check the compression by the differen-
tial pressure method.
Test pressure________hPa (psi)
Pressure drop (% or fraction)
Cyl. #
1 2 3 4
bar/
psi
(2
use of leaded fuel more than 30% of
operation
X
(2
X X X 12–20–00
Checking the
compression
05–20–00
Page 8
December 01 2017
Effectivity: 915 i A Series
Edition 0/Rev. 0

Table of Contents

Other manuals for Rotax 915 i A SERIES

Related product manuals