SECTION IV
MAINTENANCE / SERVICE
4.34 Distribution Board
Removal / Installation
A. Removal
(1) Remove four plugs (1, Figure 4-61), four screws
(2), and back section table top (3) from R.H. and
L.H. side weldments (4).
(2) Bend lip of two cover gaskets (5) and remove
four screws (6).
(3) Remove bridge cover (7) and two cover gaskets
(5) from R.H. and L.H. side weld- ments (4).
(4) Cut any cable ties which are holding wire
harnesses in place around distribution board (1,
Figure 4-62).
(5) Disconnect wire (2) from terminal of distribution
board (1).
(6) Disconnect four wire harnesses (3) from front
terminals of distribution board (1).
(7) Tag and disconnect seven wire harnesses (4)
from middle terminals of distribution board (1).
(8) Tag and disconnect one wire harness (5) from
rear terminals of distribution board (1).
(9) While pressing in on locking tab of standoff (6),
raise that corner of distribution board (1) past
locking tab.
(10) Repeat step 9 for three remaining standoffs (6)
and then remove distribution board (1) from
standoffs (6).
(11) Remove four screws (7) and four cable tie
standoff assemblies (8) from distribution
board (1).
Page 4-58Printed in U.S.A.
Figure 4-61. Covers Removal / Installation
CA807000
3
1
2
4
5
6
7
4
Figure 4-62. Distribution Board
Removal / Installation
7
5
4
3
9
8
1
2
CABLE
TIE
LOCKING
TAB
6
6
CA818800
© Schaerer Mayfield USA, Inc. 2004

Table of Contents

Other manuals for Schaerer 7300