Operating Instructions Chapter 7
C4000 Palletizer Std./Adv.
C4000 Fusion
8012249/YT69/2016-02-25 © SICK AG • Industrial Safety Systems • Germany • All rights reserved 81
Subject to change without notice
Electrical installation
7.9 Application diagnostic output (ADO)
Pin 7 on the system plug is a signal output (ADO). You can use this output for a relay or a
PLC.
If you connect the signal output, then you must configure it with the aid of the CDS prior to
commissioning.
Device configuration after replacement!
If you replace a safety light curtain on which the signal output (ADO) is connected, then you
must transfer the configuration to the device again. It is not sufficient to make the electri-
cal connections, because new devices are supplied ex factory with the signal output
deactivated.
7.10 Test input (sender test)
The sender test is performed when 0 V is present at the test input (pin 3).
To be able to use the sender test button, you must also configure the sender test function
with the aid of the CDS.
application diagnostic output
WARNING
sender test button
Sender test control, e.g.
using button