FLOWSIC100 Operating Instructions
Gas Velocity Monitor
Assembly and Installation
74
©
SICK MAIHAK GmbH · Germany · All rights reserved
88012513/03-2008
3.3 Installation
3.3.1 General Instructions, Prerequisites
Before you start the installation work, you must have carried out the steps described in Sec-
tion 3.2.
Unless otherwise agreed with SICK MAIHAK or an authorized representative, all of the in-
stallation work must be carried out by the customer. This includes:
Laying all the power supply and signal cables
Connecting the power supply and signal cables to the system components
Installing the switches and power fuses
If you are using a purge-air unit, the additional activities described in Section 3.3.2 must
also be carried out.
Notes: Plan adequate cable cross-sections (see Section 2.6 "Technical Data")
The cable ends with connector for connecting the sender/receiver units must be long en-
ough.
Cable connectors that are not connected must be protected from dirt and moisture (fit
cover).
DANGER
Warning
All installation work must be carried out in line with the relevant safety regulations and
instructions listed in Chapter 1.
Suitable measures must be taken to protect against danger.
3.3.2 Installing the Purge-air Supply
The following steps are only necessary if you have to use purged sender/receiver units.
Lay the purge-air hoses on short routes and without krinks, shorten if necessary.
Leave sufficient distance to hot duct walls.
When installing to insulated ducts, keep the cooling air outlet (see Fig. 2.11 to Fig. 2.13)
uncovered!