EasyManua.ls Logo

SICK DUSTHUNTER T - Page 272

SICK DUSTHUNTER T
552 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FLOWSIC100 Operating Instructions
Gas Velocity Monitor
Assembly and Installation
80
©
SICK MAIHAK GmbH · Germany · All rights reserved
88012513/03-2008
3.3.4 Connecting the Control Unit MCU
Fig. 3.23: Component alignment in the MCU (without purge-air supply, with options)
Necessary activities
Connect the cables for the sender/receiver units as shown in Fig. 3.24.
Note: If the distance between the sender/receiver units and the evaluation unit is large, we
recommend that you use a bus wiring configuration.
Connect the cables for status signals (operation/malfunction, warning, maintenance,
check cycle; analog output, and external maintenance switch according to the require-
ments.
Connect the power supply cable to terminals L1, N, PE (see Fig. 3.23.)
Option display module
Option
interface module
Option I/O module
Processor board
Terminals for power
supply
Power supply (behind
processor board)

Table of Contents

Related product manuals