Installation
3
3.1 Overview
Introduction
In this section; we will show you how to prepare the ET 200PA SMART components for
installation and how to install them.
The installation is carried out exclusively with active bus modules.
For the installation of an ET 200PA SMART, you must also take into account the mechanical
and electrical installation. You can find information on this in section "Assignment planning
(Page 17)".
Open equipment
The modules of an ET 200PA SMART are open equipment. That means you must install the
ET 200PA SMART in enclosures, cabinets, or electrical operating areas. These may only be
accessible by means of a key or a tool. Only trained or authorized personnel are permitted to
have access to the enclosures, cabinets or electrical operating areas.
3.2 Installation
3.2.1 Mounting Sequence
Installation steps
Depending on the desired configuration, you have to carry out the following steps consecutively
for the installation:
1. Installing the mounting rail
2. Installing active bus modules
3. Installing modules
4. Performing the final work
Detailed information on the individual installation steps can be found in the following sections.
ET 200PA SMART
Operating Instructions, 06/2019, A5E34192013-AB 31