Commissioning
4.3 Creating a project
Commissioning with Startdrive
58 Commissioning Manual, (IH3), 07/2016, 6SL3097-4AA10-0BP0
Click on "Browse", double-click on the required project in your directory structure, select
project file "*.ap14".
Figure 4-4 Opening an existing project from the directory
Then click on "Open".
Result
The selected project opens. If another project was previously displayed, then it is now
closed.
If you have created a new project, the next possible steps for the project that has been
opened are now displayed in the detailed review (see the description in the following
Chapters).
If you have opened an existing project, the interconnected modules of this project are
displayed in the device view. You can specify existing modules differently, or remove
existing modules and insert new modules instead.