SIPROTEC, 7SD80, Manual
E50417-G1140-C474-A1, Release date 09.2011
231
Mounting and Commissioning 3
This chapter is intended for experienced commissioning staff. The staff must be familiar with the commissioning
of protection and control systems, with power systems management and with the relevant safety rules and
guidelines. Under certain circumstances, it may become necessary to adapt parts of the power system hard-
ware. Some of the primary tests require the protected line or equipment to carry load.
3.1 Mounting and Connections 232
3.2 Checking Connections 252
3.3 Commissioning 258
3.4 Final Preparation of the Device 280