5 Putting the system into operation Sirona Dental Systems GmbH
4.3 Control panel on the assistant element C3
+
59 06 404 D 3390
28 D 3390.201.01.18.02
5 Putting the system into operation
Initial startup
The disinfection system adds a disinfectant to the water
(1:100) to significantly reduce the formation of microor-
ganisms in the water system.
Prior to initial startup of your treatment center, sanita-
tion must be performed.
If, upon agreement with you, the service engineer did not
complete the sanitation procedure after installing your
treatment center, or if sanitation has not been performed
for over a week, please perform the sanitation yourself.
Refer to the document "Care and Cleaning by the
Practice Team" for more information.
Sanitation takes approx. 24 hours.
Main switch
Switch the main switch ON (I ).
During power-up, the treatment center automatically
performs a self-test.
For safety reasons, always switch the treatment center
OFF (O) after consulting hours. This cuts off the air and
water supply as well as the line voltage.
Operational readiness
After the end of the self-test, the message READY the
time and the last user selected (A or B) appear on the
display.
After the treatment center is switched on, the cursor is
between the chair program keys 1 and 2. If a program
LED is lit, then the chair was in a programmed position
before the unit was switched off. If no program LED is lit,
then the chair was in a non-programmed position before
the unit was switched off.
The unit is now ready to operate.