EasyManua.ls Logo

Skyla HB1 - Installation and Setup

Skyla HB1
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-4
2.3 Installation and Setup
This section provides important information for the
installation and setup of the skyla
TM
Clinical Chemistry
Analyzer.
Exterior function diagram
Installation Location
Place the skyla
TM
Clinical Chemistry Analyzer
on a
level surface off
the ground and be sure that the surface
is:
Free from vibration.
Clean and free of contaminants.
Indoors at a room temperature of 10–32 °C
(50 - 89.6 °F).
Away from direct sunlight and other heat sources.
At least 10cm from any
wall to ensure proper
ventilation around the analyzer and access to
the
Power button
Disc drawer
Touchscreen LCD
Built-
in thermal printer
RJ45 network port
USB port
Power socket
RS232 port

Table of Contents