Procedure:
1. Use a crane to set the oil tray down in the appropriate position
so that it is aligned underneath the transformer compartment of
the MVPowerStation. Take the heavy weight of the oil tray
into account.
2. Transport the MVPowerStation to the mounting location (see Section4.3, page41).
3. Set the MVPowerStation down on the support surface, and attach it if necessary.
4. Adjust the height of the oil tray to the height of the MVPowerStation. Secure the oil tray against floating away if
necessary.
5. Unscrew the nuts from the stud bolts of the support feet for the service platforms and remove them together with
the washers.
6. Guide the stud bolts of the support feet for the service platform
into the working platform fittings and mount each of them with
a washer and nut (width across flats: 16mm).
7. Remove the cable ties from the fuse of the locking mechanism.
8. Remove the locking mechanism fuse.
4 Transport and Mounting
SMA Solar Technology AG
System Manual 47MVPS22JP-SH-en-11