EasyManua.ls Logo

SMC Networks Prime-600 - Manual Sequence Work Mode; Setup for Manual Sequence

SMC Networks Prime-600
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Prime - 600
34
“Manual Seq” Work mode (Manual static resistance measurement sequence).
We will select this work mode when we wish to measure several resistances
automatically and with precision in one same test.
Setup:
1. Connect the high current cables to the current taps of the Prime - 600.
2. Connect the measurement cables to the voltage measurement
connections of the Prime - 600.
3. Turn on the equipment.
4. Access the work mode menu.
* Burning Time: time, in seconds, to acquire data once the injection
has reached the requested current.
* Waiting T.Out: time, in seconds, that the user has, after carrying
out the measurement, to disconnect the measurement cables and
connect them again to carry out the next one.
Validate
selection
Exit menu
Manual sequence

Table of Contents

Related product manuals