4-24
BVW-55 P2
15. Threading link assembly installation
Install the threading link assembly.
(Refer to step 11 in Section 4-5.)
16. Full top sensor installation
Install the full top sensor.
(Refer to step 12 in Section 4-5.)
17. S and T catchers installation
Install the T and S catchers.
(Refer to step 13 in Section 4-5.)
18. Tension regulator band installation
Install the tension regulator band.
(Refer to Section 3-9.)
19. T tension regulator arm installation
Install the T tension regulator arm.
(Refer to Section 3-9.)
20. S tension regulator arm installation
Install the S tension regulator arm with two
screws. (Refer to Section 4-10.)
21. Drum assembly installation
Install the drum assembly. (Refer to Section 3-5.)
22. Pinch arm assembly installation
Install the pinch arm assembly.
(Refer to Section 3-7.)
23. VH cleaner assembly installation
Install the VH cleaner assembly.
(Refer to Section 3-6.)
Adjustment after replacement
24. Tape running adjustment
(Refer to Section 5-4.)
25. Video tracking adjustment
(Refer to Section 5-5.)
26. CTL head position adjustment
(Refer to Section 5-7.)
27. AT head position adjustment
(Refer to Section 5-8.)
4-6. S/T Threading Gear Replacement