EasyManua.ls Logo

Stryker Sidne - Page 81

Stryker Sidne
123 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
76 EN
Voltage dips,
short
interruptions and
voltage
variations on
power supply
input lines
IEC61000-4-11
<5% Ut
(>95% dip
in Ut) for
0.5 cycle
40% Ut
(60% dip in
Ut) for 5
cycles
70% Ut
(30% dip in
Ut) for 25
cycles
<5% Ut
(>95% dip
in Ut) for 5
sec.
<5% Ut
(>95% dip in
Ut) for 1
cycle
40% Ut
(60% dip in
Ut) for 5
cycles
70% Ut
(30% dip in
Ut) for 25
cycles
<5% Ut
(>95% dip in
Ut) for 5 sec.
Mains power
quality should
be that of a
typical
commercial or
hospital
environment. If
the user of
Sidne™ requires
continued
operation during
power mains
interruptions, it
is recommended
that Sidne™ be
powered from
an constant
power supply or
a battery.
Power frequency
(50/60Hz)
magnetic field
IEC 61000-4-8
3 A/m 3 A/m Power-
frequency
magnetic fields
should be at
levels
characteristic of
a typical
location in a
typical
commercial or
hospital
environment.
NOTE: Ut is the a.c. mains voltage prior to application of the test level.
Guidance and Manufacturer's Declaration: Electromagnetic
Immunity (Continued)

Table of Contents

Other manuals for Stryker Sidne

Related product manuals