SHUT VALVE
EMISSION CONTROL
(AUX.
EMISSION CONTROL DEVICES)
14.Shut
Valve
B: INSTALLATION
Install in the reverse order of removal.
Tightening torque:
A:
REMOVAL
1)
Disconnect the ground terminal from battery.
4.5
N.m
(0.46
kgf-m,
3.3 ft-lb)
2) Drain fuel from the fuel tank. <Ref. to FU(D0HC
TURBO)-52, REMOVAL, Fuel Tank.>
3)
Remove the fuel filler pipe. <Ref. to FU(D0HC
TURBO)-55, REMOVAL, Fuel Filler Pipe.>
4)
Disconnect the evaporation hoses from shut
valve.
EN1
057
5)
Remove the shut valve from fuel filler pipe.
EN105.5
I
I
EN1
I
-
5E
-
C: INSPECTION
Make sure the hoses are not cracked or loose.
EC(D0HC TURBO)-16