EasyManua.ls Logo

Suzuki LT-Z50 - Transporting

Suzuki LT-Z50
215 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE 3-49
Install the crankshaft 4 and dowel pins 5 to the upper crank-
case/cylinder.
NOTE:
Apply engine oil to the bearing 6 balls and conrod big end 7.
CRANKCASE
Apply SUZUKI BOND “1215” to the lower crankcase matching
surface.
99000-31110: SUZUKI BOND “1215” or equivalent
NOTE:
Use of SUZUKI BOND is as follows:
* Make surfaces free from moisture, oil, dust and other foreign
materials.
* Spread on surfaces thinly to form an even layer, and assemble
the crankcases within few minutes.
Tighten the crankcase bolts to the specified torque.
Crankcase bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
Install the bushing 1 to the upper crankcase/cylinder.
Install the bushing 2 to the generator case.
PartShark.com
877-999-5686

Table of Contents

Other manuals for Suzuki LT-Z50

Related product manuals