EasyManua.ls Logo

Suzuki LT-Z50 - Washing and Post-Cleaning Inspection

Suzuki LT-Z50
215 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE 3-53
NOTE:
Turn the fixed drive face 3 until the drive belt is seated in and
both the drive and driven faces will move together smoothly
without slip.
CVT CASE COVER
Install the dowel pins 1 and gasket 2.
Install the starter pinion 3.
Install the CVT case cover 4.
Tighten the CVT case cover bolts to the specified torque.
CVT case cover bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
NOTE:
* Tighten the bolt A together with the clamp 5.
* Tighten the bolt B together with the earth terminal after
remounting the engine.
GENERATOR ROTOR
Tighten the generator coil bolts 1 and pick-up coil bolts 2.
Pass the generator lead wire to the generator case groove A.
Generator coil bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
Pick-up coil bolt: 4.5 N·m (0.45 kgf-m, 3.0 lb-ft)
Install the key 3.
NOTE:
Degrease the tapered portion of the crankshaft and also the
rotor.
The removed gasket must be replaced with a new one.
PartShark.com
877-999-5686

Table of Contents

Other manuals for Suzuki LT-Z50

Related product manuals