Operation
Commissioning
49
Operation
Commissioning
Commissioning and the start-up after service and maintenance works are
near enough the same procedures.
The daily start-up procedure via the controller of the overall conveyor system
is described in the system documentation or in the controller documentation.
The machine is designed for the following electrical connection data:
3 phases, neutral conductor and earthing conductor
Alternating voltage 400 V
Mains frequency 50 Hz
Commissioning and start-up after service and
maintenance works
Requirements:
Machine has been erected appropriately.
The working area of the machine is inaccessible for unauthorised
personnel.
The main switch for the power supply to the machine is switched off and
has been secured against accidental switch-on.
Machine downtime no longer than 4 weeks.
Check the assembly
Complete the following steps:
1. Check the position of all pulleys and rollers.
2. Check if the drive elements are correctly fitted, aligned and tensioned.
3. Protection installation is correctly fitted.
4. Check the machine for foreign particles and remove them if necessary.
Assembly has been checked.