EasyManuals Logo

TSI Quest EG5 User Manual

TSI Quest EG5
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
1: Introduction
Overview
5
Noise Assessment Steps
1. Perform a task-based work flow analysis of unacceptable “noisy” areas and list
regulations/codes you will follow.
Observe facility/areas and jot down areas of concern.
Check with standards and noise ordinance regulations in your region/city.
See Chapter 1 for basic information on dosimetry and standards.
3. Running your studies.
Calibrate dosimeter.
Attach the dosimeter.
Run, observe, and stop your studies.
Understand display indicators.
See Chapter 4 “Running and operating”.
4. View your results via Detection Management Software (DMS).
Working with Charts and Tables.
Organizing and saving your studies.
See Chapter 5 to view measurements with DMS.
6. Develop corrective actions.
Engineering: redesign tools, implement changes in workstation.
Administrative: job sharing/rotations, redefinition of job functions, reduce duration
operating tool/equipment, and/or implement medical surveillance.
2. Setting up your dosimeter parameters for your noise studies.
Customize measurement setup (i.e., criterion level, threshold, weighting, exchange
rate, etc.)
See Chapter 2 for getting started with your dosimeter.
See Chapter 3 for customizing your setup parameters.
See Chapter 5 for Noise study scenarios.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TSI Quest EG5 and is the answer not in the manual?

TSI Quest EG5 Specifications

General IconGeneral
BrandTSI Quest
ModelEG5
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals