APX 525/625 Generator Revision C Service Adjustments
©
2005 Del Medical Imaging Corporation
7/5/2005 Page 122
ADJUSTMENT POT IDENTIFICATIONS
GENERATOR START UP OPERATIONAL TESTS AND INSTALLATION SET-UP
This procedure will verify correct electrical operation and lead the service engineer
through the generator calibration. This procedure is not intended to limit the service
engineer's final assembly inspections. At the discretion of the engineer, additional
testing may be of value. Instructions and test criteria can be obtained by contacting
our technical support group. This procedure assures that mechanical and electrical
assemblies of the generator have been completed. Further, this procedure requires
that the default system configuration setup of the controller has already been
programmed.
R65