EasyManua.ls Logo

VALCO MELTON D4-E - Section 7 - Maintenance; General Maintenance Procedures

Default Icon
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MM101 – D-4E HOT MELT UNIT 72
VALCO MELTON S.L.U. Pol. Ind. Agustinos C/G 34 3116 0 ORCOYEN, NAVARRA
TEL: +34 948 321580 Fax: +34 948 326584 melton@melton.es www.valcomelton.com
SECCION 7 - MAINTENANCE
This section contains guidelines and procedures for maintaining the D4-E
hot melt unit. Your hot melt system will run longer and more consistently if a
preventative maintenance program is used. Daily attention to the
maintenance of your system is recommended.
ValcoMelton recommends the following general maintenance procedures:
Keep the tank as full of adhesive as possible. This reduces the
formation of charred adhesive on the interior side walls of the tank.
Keep the tank lid closed. (Any contamination in the tank will
increase the chance of poor performance Moisture, dirt, and
charred adhesive are the major causes of clogged nozzles .).
Remove adhesive spills immediately. (Use a putty knife while the
material is still soft).
While the unit is still hot, but not operating, use cheesecloth to
remove material leaking from the pump seal and other connectors.
External leakage indicates that service is required.
Shut down the system once a week and remove and clean the
manifold filter. Replace the filter if it cannot be thoroughly cleaned.
Completely drain and clean the system when clogging due to
charred adhesive or dirt becomes frequent.
Periodically clean the exterior of the D4-E hot melt unit.
In order to prevent pressure buildup in
the tank, the tank lid does not have a
seal
.
General

Table of Contents

Related product manuals