EasyManua.ls Logo

Vertiv Liebert EXM2 - Page 105

Vertiv Liebert EXM2
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
M essage 1 M essage 2 M essage 3 D efinition
LOAD ON INVERTER OUTPUT OVERLOAD
TRANSFER TO BYPASS
PENDING
This system is in critical operating mode, supplied by the
inverter, and the load is about to be transferred to the bypass
due to overload timeouts
LOAD ON INVERTER
ALARM ACTIVE
CRITICAL
VIEW ALARM LOG FOR
DETAILS
This system is in critical operating mode, supplied by the
inverter. There is a critical fault in the system that the user
needs to view
LOAD ON BYPASS
LOAD
AUTOMATICALLY
TRANSFERRED TO
BYPASS
VIEW ALARM LOG FOR
DETAILS
This system is in critical operating mode, supplied by the
bypass. The system moved the load to the bypass due to a
critical fault in the system
LOAD ON BYPASS
ALARM ACTIVE
CRITICAL
VIEW ALARM LOG FOR
DETAILS
This system is in critical operating mode, supplied by the
bypass. The system is running on bypass not due to auto-
transfer, and a critical fault is active in the system
LOAD ON BATTERY
X MINUTES
REMAINING
LOAD SHUTDOWN IMMINENT
This system is in critical operating mode, supplied by the
inverter via the battery. The battery is extremely low and the
load will turn Off or transfer to bypass soon
LOAD OFF
ALARM ACTIVE
CRITICAL
VIEW ALARM LOG FOR
DETAILS
This system is in critical operating mode, load not supplied by
this unit. The load is not supplied for some reason and a critical
fault is active
LOAD OFF
This system is in critical operating mode, load not supplied by
this unit. The load is not supplied, and no active fault is present
LOAD ON BATTERY
ALARM ACTIVE
CRITICAL
VIEW ALARM LOG FOR
DETAILS VIEW ALARM LOG
FOR DETAILS
This system is in critical operating mode, supplied by the
battery. The system is running on inverter via the battery, is not
in imminent shutdown and a critical fault is active in the system
LOAD OFF
SERVICE MODE
ACTIVE
This system is Off with a service mode active
LOAD ON INVERTER
ENERGY SAVING
MODE ACTIVE
ALARM ACTIVE CRITICAL
This system is in critical operating mode, supplied by the
inverter. The system is running on inverter, with an energy
saving mode active and a critical fault is active in the system
LOAD ON BYPASS
ENERGY SAVING
MODE ACTIVE
ALARM ACTIVE CRITICAL
This system is in critical operating mode, supplied by the
bypass. The system is running on bypass, with an energy
saving mode active and a critical fault is active in the system
LOAD OFF
ENERGY SAVING
MODE ACTIVE
ALARM ACTIVE CRITICAL
This system is in critical operating mode. The system is NOT
running, with an energy saving mode active and a critical fault
is active in the system
LOAD OFF TEST MODE ACTIVE - This system is off with a TEST MODE active
LOAD ON INVERTER TEST MODE ACTIVE ALARM ACTIVE CRITICAL
This system is in critical operating mode, supplied by the
inverter, running in a system test mode, and has an active fault.
This means the system is in TEST MODE and something
critical was determined to be outside normal test operations
LOAD ON BYPASS TEST MODE ACTIVE ALARM ACTIVE CRITICAL
This system is in critical operating mode, supplied by the
bypass, running in a system test mode, and has an active fault.
This means the system is in TEST MODE, and something
critical was determined to be outside normal test operation
Table 5.3 Critical status m essag es
5 Operator Control and Display Panel
97
Vertiv™ Liebert® EXM2 UPS User Manual

Table of Contents

Related product manuals