EasyManua.ls Logo

Wacker Neuson G 240

Wacker Neuson G 240
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
wc_tx003614gb_FM10.fm
170
Mobile Generator
General Maintenance
16.11 Filling the Radiator
When
Every 2000 hours or 2 years
Requirements
Machine shut down
Engine cool to touch
Fresh coolant (as needed)
Procedure
Perform the procedure below to fill the radiator.
1. Open the access cover on the roof (a).
2. Slowly rotate the radiator cap (b) counterclockwise to release any remaining
system pressure. Unscrew and remove the radiator cap after the pressure has
been release.
3. Add coolant by filling at a rate of approximately 1.5 gallons per minute for 6
minutes.
4. Wait 10 minutes. Then, fill at a rate of approximately 1.5 gallons per minute for
3:30 minutes or until full.
5. Run the machine under a 50% load for approximately 15 minutes until the
coolant temperature exceeds 190°F.
6. Inspect the radiator cap and cap seal for damage. Clean the radiator cap or
replace if necessary.
This procedure continues on the next page.
WARNING
Burn hazard. Engine coolant is hot and under pressure at operating temperature.
Check the coolant level only after the engine has been shut down and is cool.
wc_gr012631
ADVERTENCIA
WARNUNG
WARNING
aa
b
WARNING
Burn hazard. Coolant can contain alkali.
Avoid coolant contact with skin and eyes.

Table of Contents

Other manuals for Wacker Neuson G 240