EasyManua.ls Logo

Wacker Neuson G 240

Wacker Neuson G 240
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
wc_tx003618gb_FM10.fm
64
Mobile Generator
Operation (Basler Controller)
7.10 Starting and Running the Generator
Preliminary
Perform the procedure below to start and run the machine.
1. Set the engine start switch (a) to the OFF position.
Note: Graphic is representative only. Your machine may vary.
2. Set the main circuit breaker (b) to OFF.
3. Set the convenience receptacle circuit breakers (c, d) to OFF.
4. Turn off all loads.
5. Check position of the voltage selector switch (e) and make sure it is set for the
desired voltage output. Lock the voltage selector switch in place if desired.
6. If equipped, set the idle switch (g) to the low speed position (turtle).
This procedure continues on the next page.
CAUTION
Possibility of injury or equipment damage. Failure to match phase, voltage, and
frequency may cause equipment connected to the generator to operate incorrectly.
When using the generator as a stand-by or substitute power supply, make sure
the phase, voltage, and frequency of the generator matches that of the utility
lines or of any other power source normally used.
wc_gr011540
A
Ø
HZ
V
R
Basler
DIAGNOSTICS
DIAGNOSEN
DIAGNOSTICOS
DIAGNOSTICS
AUSAUS
APAGADOAPAGADO
ARRETARRET
OFFOFF
REMOTE STARTREMOTE START
FERNSTARTFERNSTART
ARRANQUE REMOTOARRANQUE REMOTO
DEMARRAGE A DEMARRAGE A
DISTANCEDISTANCE
START / LAUFENSTART / LAUFEN
ARRANQUE / MARCHAARRANQUE / MARCHA
DEMARRER / MARCHEDEMARRER / MARCHE
START / RUNSTART / RUN
AUAUSS
APAGADAPAGADOO
ARREARRETT
OFOFFF
REMOTE STARREMOTE STARTT
FERNSTARFERNSTARTT
ARRANQUE REMOTARRANQUE REMOTOO
DEMARRAGE ADEMARRAGE A
DISTANCDISTANCEE
START / LAUFESTART / LAUFENN
ARRANQUE / MARCHARRANQUE / MARCHAA
DEMARRER / MARCHDEMARRER / MARCHEE
START / RUSTART / RUNN
d
c
e
b
a
f
g

Table of Contents

Other manuals for Wacker Neuson G 240