EasyManua.ls Logo

Wacker Neuson G 240

Wacker Neuson G 240
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
wc_tx003570gb_FM10.fm
36
Mobile Generator
Lifting and Transporting
4 Lifting and Transporting
4.1 Lifting the Machine
Requirements
Lifting equipment (crane, hoist, or fork truck) capable of supporting the
machine’s weight
Lifting devices (hooks, chains, and shackles) capable of supporting the
machine’s weight
Engine stopped
Lifting the
machine
A lifting eye is used for lifting the machine.
Perform the procedure below to lift the machine.
1. Attach the lifting devices and equipment to the lifting eye. Do not attach lifting
devices to any other part of the machine.
2. Lift the machine a small distance.
3. Check for stability. If necessary, lower the machine, reposition the lifting devices,
and lift the machine a small distance again.
4. Continue lifting the machine only when it is stable.
wc_gr011429
WARNING
Crushing hazard. An unstable machine may cause the lifting devices and
equipment to fail. You may be crushed if the lifting devices and equipment fail.
Check for stability before continuing.

Table of Contents

Other manuals for Wacker Neuson G 240