EasyManua.ls Logo

WittRock Integris 2001 - Preventive Maintenance Schedule

Default Icon
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preventive Maintenance
Chapter 6: General Procedures
Preventive Maintenance Schedule
Table 6-1. Preventive Maintenance Schedule
Function Procedure
Power cables Inspect all cables for good condition and possible
cracking or cuts or pinches in insulating coverings.
Circuit breakers Turn the breaker off and on to check proper function.
Electrical
receptacles
Check all receptacles for proper ground conductor
extractive force. The extractive force should be four
ounces with a 0.184" (4.67 mm) diameter pin.
Electrical
connections
Check all electrical connections for tightness, and
tighten as needed.
Gas supply conduit Inspect all joints in the Integris® 2001 Headwall Sys-
tem for gas leaks. Inspect hoses for cracking, wear,
collapse, or leakage.
General appearance Check cleanliness. See Cleaning and Care on page
6-3 if needed.
Page 6 - 6 Integris® 2001 Headwall System Service Manual (man148ra)

Table of Contents