Final Actions
Chapter 2: Troubleshooting Procedures
Final Actions
1. Complete the required preventive maintenance procedures. See
“Preventive Maintenance” on page 6-5.
2. Return all equipment to normal operating condition.
a. Close all panels.
b. Connect any disconnected wires/connectors.
c. Remove all tools and test equipment.
3. Complete all required administrative tasks.
2
Integris® 2001 Headwall System Service Manual (man148ra) Page 2 - 5