Tool and Supply Requirements
Chapter 6: General Procedures
Tool and Supply Requirements
The following tools are required to service the Integris® 2001 Headwall
System:
• Screwdriver
• Phillips head screwdriver
• Pliers
• Adjustable wrench
• Digital multi-meter
• Teflon tape
Installation and Post-Installation Inspection
• WittRock will supply the h
anger bracket consisting of a steel wall plate and
mounting fasteners.
• Complete installation instructions are supplied with every Integris® 2001
Headwall System. These instructions reflect the variations in each system
as ordered.
• In seismic code areas, contact WittRock for additional information
concerning installation.
• The mechanical contractor shall install and provide primary connections to
the Integris® 2001 Headwall System medical gas manifold as detailed on
the drawings. The mechanical contractor will perform and certify all
pressure tests as required by NFPA 56F (nonflammable medical gas
systems) and any local codes.
• The electrical contractor shall furnish and install conduit to the hanger
bracket knockout plate with wiring. The contractor will make the
connection of building services to the pre-wired junction box as shown in
the electrical drawings in the installation instructions.
• After installation, the electrical contractor shall be responsible for checking
the entire system for proper operation.
• Upon request, a WittRock representative may periodically check with the
contractor during initial installation and assist the contractor in the final
check to make certain the installation is in operating condition. (The final
certification shall be the responsibility of the electrical and mechanical
contractors for their portions of the installation.)
Page 6 - 8 Integris® 2001 Headwall System Service Manual (man148ra)