Function Checks
Chapter 2: Troubleshooting Procedures
Yes No
↓ → Go to “Function Checks” on page 2-4.
4. Instruct the operator to refer to the procedures in the Integris® 2001
Headwall System In-Service Manual. To ensure proper operation of the
Integris® 2001 Headwall System, perform the “Function Checks” on page
2-4.
Function Checks
1. Initial Actions have been performed.
Yes No
↓ → Go to “Initial Actions” on page 2-3.
2. The chart light is operational.
Yes No
↓ → Go to RAP 2.1 on page 2-6.
3. The dimmer switch is operational.
Yes No
↓ → Go to RAP 2.2 on page 2-8.
4. The line voltage switch is operational.
Yes No
↓ → Go to RAP 2.3 on page 2-10.
5. The duplex electrical receptacle is operative.
Yes No
↓ → Go to RAP 2.4 on page 2-12.
6. The timed light switch operates correctly.
Yes No
↓ → Go to RAP 2.5 on page 2-13.
7. The low voltage controller is operating the attached device.
Yes No
↓ → Go to RAP 2.6 on page 2-15.
8. Go to “Final Actions” on page 2-5.
Page 2 - 4 Integris® 2001 Headwall System Service Manual (man148ra)