EasyManua.ls Logo

YSI 2900 series - Installation; Unpacking the Monitor; Installing Monitor Components

YSI 2900 series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
2 Installation
2.1 Unpacking the Multi-Channel Online Monitor
1. Inspect the shipping container(s) for damage due to shipping.
2. If the shipping box appears damaged in any way, immediately contact YSI Technical Support.
3. Remove the Multi-Channel Online Monitor components from the shipping box.
4. Verify the shipment contents using the enclosed packing list and packing check list to ensure the following items
are present:
2940 or 2980 Multi-Channel Online Monitor
Power cord
Power supply
Reagent bottles with cap/tubing assemblies (2)
Waste bottle with cap/tubing assembly
Monitor Sample Cup
2877 Peristaltic pump tubing set
2876 Monitor Sample Cup tubing set
Serial (null modem) communication cable (DB9 to DB9 connectors)
Analog output cables (4 or 8, depending on which system was ordered)
2.2 Installing the Multi-Channel Online Monitor Components
Place the components of the Multi-Channel Online Monitor on a counter or cart where it will be stationed. YSI recommends
that the Multi-Channel Online Monitor power supply be used with a surge protector.
The Multi-Channel Online Monitor must be powered off prior to connecting or disconnecting any cables
from the top or rear communication panels. Connecting or disconnecting cables with the power on may
cause software and/or communication errors with the Multi-Channel Online Monitor and 2900 Series
Analyzer.

Table of Contents

Related product manuals