17
2.2.4.3 Sample and Waste Line Installation
1. Run the sample and waste lines from the Multi-Channel Online Monitor through the tubing port on the side of the
2900 Series Analyzer (Figure 2-9).
2. Connect the waste line to the Monitor Sample Cup by carefully sliding the waste line onto the side connector
(Figure 2-9).
3. Connect the sample line to the Monitor Sample Cup by carefully sliding the sample line onto the bottom
connector (Figure 2-9).
4. Connect the other end of the sample line to the Multi-Channel Online Monitor sample line connection on the
Left side of the peristaltic pump (Figure 2-10).
Figure 2-10
5. Connect the other end of the waste line to the Multi-Channel Online Monitor waste line connection on the Right
side of the peristaltic pump (Figure 2-10).