EasyManua.ls Logo

YSI 2900 series - Page 23

YSI 2900 series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
2.2.4.3 Sample and Waste Line Installation
1. Run the sample and waste lines from the Multi-Channel Online Monitor through the tubing port on the side of the
2900 Series Analyzer (Figure 2-9).
2. Connect the waste line to the Monitor Sample Cup by carefully sliding the waste line onto the side connector
(Figure 2-9).
3. Connect the sample line to the Monitor Sample Cup by carefully sliding the sample line onto the bottom
connector (Figure 2-9).
4. Connect the other end of the sample line to the Multi-Channel Online Monitor sample line connection on the
Left side of the peristaltic pump (Figure 2-10).
Figure 2-10
5. Connect the other end of the waste line to the Multi-Channel Online Monitor waste line connection on the Right
side of the peristaltic pump (Figure 2-10).
Sample Line
Waste Line

Table of Contents

Related product manuals