593D SYSTEMS, INC. PN:80-D27 Rev.B
7. Push the carriage to the end position, then close the airlock door.
8. Check that the Hirth clamping system of the sintering piston is clean. If not, clean it with the use of a brush and/or the
vacuum cleaner.
9. Execute the Plate Loading cycle on the control panel (see "Step 4 : Loading plate" on page 41) : the whole plate will
be placed automatically on the sintering piston.
Zero sintering search
Operations described below complement and follow on from the Preparation Assistant "Step 5 : Zero sintering" on page
42.
The zero research is performed with the roller. Please ensure :
The sintering plate must be clean. No dust must be located on its surface. The roller should not get in
touch with any powder during this cycle. Make sure to keep a clean area as described on the section
"Unloading a plate" on page 64.
1. Check the sintering plate is clean. If not, clean it with the use of the vacuum cleaner.
2. Execute the Zero sintering cycle on the control panel (see "Step 5 : Zero sintering" on page 42).
3. The zero sintering value will then be displayed (1).
1