EasyManua.ls Logo

ABB FOX615 - Page 4

ABB FOX615
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 FOX615Installation
3 Installation procedures 35
3.1 Unpacking and equipment check 35
3.1.1 Before you start … 35
3.1.2 Packing of the subrack and accessories 36
3.1.3 FOX615 equipment 38
3.1.4 Signal cables 38
3.2 ETSI adapters (option) 39
3.3 Captive nuts 40
3.3.1 19-inch racks 40
3.3.2 ETSI racks 42
3.4 Cable tray and power supply 42
3.4.1 Installing the cable tray 42
3.4.2 Installing the DC power supply 43
3.4.2.1 Power cable 43
3.4.2.2 External power supply circuit 45
3.5 Signal cables 47
3.5.1 Tying signal cables to the cable tray 47
3.5.1.1 Units 49
3.5.1.2 Fan unit 49
3.5.2 Tying cables to their connection points 49
3.6 Subrack 51
3.6.1 Installing DUPF1 (option) 51
3.6.2 Installing the FAMO1 or FAMO1-F power and alarm cable (optional) 55
3.6.3 Installing the subrack 57
3.6.3.1 Prerequisites 57
3.6.3.2 Subrack installation 57
3.6.3.3 Subrack earthing 58
3.6.4 Subrack power supply 60
3.6.4.1 Local power interfaces 60
3.6.4.2 Single circuit power supply 60
3.6.4.3 Dual power supply (DUPF1 option) 62
3.7 Fan unit or alarm unit (option) 64
3.7.1 Installing FAMO1 or FAMO1-F 64
3.7.2 FOX interface 64
3.7.3 Alarm interfaces 66
3.7.3.1 Interfaces and connectors 66
3.7.3.2 Alarm signal input interfaces 67
3.7.3.3 DUPF1 alarm interface 68
3.7.3.4 Alarm signal output interface 69
3.8 Heat deflection shield 70
3.8.1 Orientation of the shield 70
3.8.2 Installing the shield 72
3.9 Final steps 73
3.9.1 Tightening of screws 73
3.9.2 Cable clamps, earthing bar and EMC clips 73
3.9.3 Units and signal cables 76
3.9.3.1 Inserting units in the subrack 76
3.9.3.2 Connecting signal cables 78
3.9.3.3 Clamping cables to the subrack earthing bar 79

Table of Contents