CHECKLISTS
FOX615Installation 85
4 Checklists
4.1 Overview
The checklists below help you to prepare equipment and material for installa-
tion. There is a checklist provided for the
FOX equipment (NE and units)
Cables
Material
•Tools
4.2 NE and units
Please note:
For the contents of the standard packaging, refer to the section Unpacking
and equipment check (on page 35) on packaging of the subrack and acces-
sories.
Table 9: Checklist FOX equipment
Description Identification Quantity (per subrack)
Units Remark
FOX615 package:
- FOX615 subrack
1
- Front cover subrack 1 Packed with the subrack
- Cable tray 1 Packed with the subrack
- -48/-60 VDC power cable
(subrack-to cable tray)
1 Cable packed with cable
tray
Control unit CESM1 1 (2) (Unit protection)
Service units:
Type n Type and number as