EasyManua.ls Logo

ABB IRB 4400/60 - Page 177

ABB IRB 4400/60
304 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removal, signal cabling upper arm
The procedure below details how to remove the signal cabling from the upper arm.
Info/IllustrationAction
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply (do not turn off for
Foundry Prime robots!)
to the robot, before entering the robot working
area.
1
Shown in the figure Location of
signal cabling, upper arm on
page 176.
Remove the wrist bracket and the upper arm
bracket from the upper arm.
2
Shown in the figure Location of
signal cabling, upper arm on
page 176.
Remove the front and rear cable holders from
the tube shaft.
3
Disconnect the connectors at the rear of the
upper arm.
4
Refitting, signal cabling upper arm
The procedure below details how to refit the signal cabling to the upper arm.
Note/IllustrationAction
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply (do not turn off for
Foundry Prime robots!)
to the robot, before entering the robot working
area.
1
Fit transparent protection tape to the narrow
part of the tube shaft. Remove dirt and grease
from the surface first!
2
Move axis 4 to its calibration position (0°).3
Continues on next page
Product manual - IRB 4400 177
3HAC022032-001 Revision: Q
© Copyright 2004-2018 ABB. All rights reserved.
4 Repair
4.4.5 Replacement of signal cabling, upper arm (option 042)
Continued

Table of Contents

Related product manuals