EasyManua.ls Logo

ABB IRB 8700 Series - Page 749

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx1500002326
Refit the hub.3
Attachment screws: M6x30 12.9.Remove the two M6x110 and fit the attach-
ment screws for the hub.
4
Loctite 243
Apply locking liquid (Loctite 243) on the
screws.
Note
The number of attachment screws differ
depending on gearbox.
Quantity:
Axis-1 = 6 pcs
Axis-2 = 8 pcs
Axis-3 = 8 pcs
Axis-4 = 4 pcs
Axis-5 = 6 pcs
Axis-6 = 4 pcs
Tightening torque: 14 Nm.Secure the hub.5
Performing a leak-down test
NoteAction
See Performing a leak-down test on
page 184.
Perform a leak-dowm test.1
Preparations before refitting the motor
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Remove old paint residues and other contamina-
tion from the contact surfaces on both motor and
gearbox.
2
Wipe clean the contact surfaces from any remain-
ing contamination.
3
Also wipe clean the o-ring groove.
Continues on next page
Product manual - IRB 8700 749
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.4 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals