EasyManua.ls Logo

Alcatel-Lucent 7210 SAS-X - Access Node Resilience Using MC-LAG and Pseudowire Redundancy

Alcatel-Lucent 7210 SAS-X
948 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Virtual Leased Line Services
7210 SAS-X, R6 OS Services Guide Page 145
precedence 1
T-PE2
configure service epipe 1
endpoint X
exit
endpoint Y
revert-time 100
standby-signaling-slave
exit
sap 2/2/2:200 endpoint X
spoke-sdp 4:400 endpoint Y
precedence primary
spoke-sdp 5:500 endpoint Y
precedence 1
spoke-sdp 6:600 endpoint Y
precedence 1
S-PE1
VC switching indicates a VC cross-connect so that the service manager does not signal the VC
label mapping immediately but will put this into passive mode.
configure service epipe 1 vc-switching
spoke-sdp 1:100
spoke-sdp 4:400
Access Node Resilience Using MC-LAG and Pseudowire
Redundancy
Figure 20 shows the use of both Multi-Chassis Link Aggregation (MC-LAG) in the access
network and pseudowire redundancy in the core network to provide a resilient end-to-end VLL
service to the customers.

Table of Contents

Related product manuals