EasyManua.ls Logo

Allen-Bradley 1756-CNB - Page 60

Allen-Bradley 1756-CNB
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Publication 1756-UM523F-EN-P - December 2006
60 Configure the System Redundancy Module
2. Start a switchover. A. Click Synchronization.
B. Choose Initiate Switchover and then choose Yes to continue.
3. Monitor the synchronization progress. A. Click Synchronization Status.
If the controller contains a large project, the system may spend some time
synchronizing the secondary controller.
B. If the Secondary Readiness remains Disqualified:
Make sure the Auto-Synchronization option = Always.
See Find the Cause of a Switchover or Disqualification on page 104.
Action Details

Table of Contents

Related product manuals