Primera BAG0175.3
5.30 Tramline marker (optional)
When tramlines are being created, the track
discs lower automatically and mark the tramline
that has just been created. This makes the tram-
lines visible before the seed has germinated.
75
The track discs are raised hydraulically if no
tramline is being created.
• The track discs can be moved to adapt to
the track width.
• The intensity of the track discs can be ad-
justed by turning.
• Position 0: transport position,
decommissioning (the lifted tramline marker
must be locked)
• Position 1: working position
76