BAG0175.3 07.18
5.21.1.3 Tramline rhythm 2 and 6plus
Figure (Fig. 68) shows examples of tramline creation with tramline
rhythms 2 and 6plus.
When tramlines are created with the tramline rhythm 2 and 6plus (
70), tramlines are created during the trips forward and backward over
the field.
On machines with
• tramline rhythm 2, the seed feed to the tramline coulters may
only be interrupted on the right side and
• tramline rhythm
6plus, the seed feed to the tramline coulters may
only be interrupted on the left side.
the seed feed to the tramline coulters is interrupted.
Work always starts on the right hand edge of the field.
Fig. 58
5.22 Jack
• Jack raised during operation or transport.
• Jack lowered when implement is uncou-
pled.
Raising/lowering the jack:
1. Pull out the pin.
2. Remove the pin (Fig. 63/1).
3. Raise / lower the jack.
4. Fix the position of the jack with the pin and
secure using the linch pin.
59
WARNING
Risk of crushing fingers when oper-
ating the stand.