Assembly and function
UF 01 DB 238. 07.04
99
Folding in the sprayer boom
1. Open the block tap for the hydraulic height adjustment.
2. Lift the sprayer boom via the height adjustment into a medium
height position.
3. Set boom tilt adjustment to pos. "0" (if available).
4. Hold the control lever of the double acting control valve in the
position "fold in" until all the boom sections of the two booms are
fully folded.
Hint!
x During the folding in procedure the left hand boom folds in
first and then the right hand one.
x Before folding the booms automatically lock the swing
compensation. When the swing compensation is locked the
display of
shows a closed lock. Please
refer to chapter "Unlocking and locking the swing compen-
sation", page 101.
5. Lock the transport securing. For this please refer to chapter
"Locking the transport securing", page 98.