EasyManua.ls Logo

ATEQ D520 - Page 77

ATEQ D520
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 – Functions of the instrument
UM-22100H-U User manual ATEQ D520 Page 67/122
d) End of cycle and "Dump + Reset" (automatic dump)
If the part is OK, at the beginning of the test time, the pass part relay is activated and
stays activated until the start of the next cycle.
At the end of the dump time, the end of cycle relay is activated (or after the coupling
time B if it is present).
If the part is fail, at the beginning of the test time, the fail part relay is activated until the
end of the cycle, the dump phase is carried out. The end of the cycle is obtained by
pressing on the Reset key or by activating the Reset input.
PRESSURE
START
RESET
A R S T
t
t
t
t
t
t
t
Program n°
Auto
connector A
t
Part
bad
Time B
Time B
Auto
connector B
End of cycle
Test cycle
Control actions
t mini
t mini
t mini
Active
Disabled
Active
Disabled
D
The active program is the one selected before starting up. It remains active even if the
program inputs on the connector are no longer activated. This selection can only be
modified during the inter cycle period.
To return to program 1, when a cycle is not in progress, press any of the program
selection inputs.

Table of Contents

Related product manuals