EasyManua.ls Logo

ATEQ D520 - Page 78

ATEQ D520
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 – Functions of the instrument
UM-22100H-U User manual ATEQ D520 Page 68/122
e) End of Cycle "FILL"
If the part is OK, the pass part relay is activated at the end of the test time until the start
of the following cycle.
As soon as the test time is finished, if the part is fail the fail part relay stays activated.
In infinite fill mode, the instrument awaits an operator or PLC initiated reset to start the
dump time and send an end of cycle signal (or after the coupling time B if it is present).
PRESSURE
START
RESET
A R S T
t
t
t
t
t
t
t
Program
Auto
connector A
t
Bad
part
Time B
Time B
Auto
connector B
End of Cycle
Test cycle
Control actions
t mini
t mini
t mini
Active
Disabled
Active
Disabled
# D

Table of Contents

Related product manuals