EasyManua.ls Logo

Avaya S8500 - High or Critical Reliability Configuration (SCC1)

Avaya S8500
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Upgrading and administering the existing hardware
64 Migrating to the Avaya S8700 or S8710 Media Server
June 2004
High or critical reliability configuration (SCC1)
NOTE:
You can replace the tone-clocks with the IPSI circuit packs and administer them ahead of
time. The circuit packs are hot-swappable, so you do not need to power down the PNs or
the carriers.
1 Determine which PNs get the IPSI circuit packs. See Determining IPSI placement in port
networks on page 57.
NOTE:
Not every port network requires an IPSI circuit pack.
2 Type list cabinet and press Enter to determine which port networks have TN2182 Tone Clock
circuit packs and in which media gateway they are in.
3 Type status port-network number where number is the number of the port network and press
Enter to determine the active tone clock.
4 If needed, type set tone cabinet carrier and press Enter to make the tone clock in the B carrier
active.
5 Remove the ground plate, upper and lower rear covers from the media gateway(s). See Figure 7,
Removing ground plate and upper and lower rear covers, on page 65.

Table of Contents

Related product manuals