Converting a processor port network to a port network (SCC)
Migrating to the Avaya S8700 or S8710 Media Server 89
June 2004
If reusing the EI circuit pack in a CSS:
1 Move the EI/ATM Interface circuit pack from location C02 to location A01.
2 If critical reliability, move the EI/ATM Interface circuit pack from location D02 to location B02.
If using ATM EIs:
3 Run the fiber optic cables for the expansion interface circuit packs through the media gateway,
using a cable pass-thru kit.
4 Connect the fiber optic cables to the connector on the front of the expansion interface circuit
packs. LED lights up when properly connected.
Powering up the media gateway(s)
1 Power up the media gateways.
2 Remove the emergency ground wire if used.