EasyManuals Logo

Beckman Coulter UniCel DxC Synchron 800 User Manual

Beckman Coulter UniCel DxC Synchron 800
510 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #303 background imageLoading...
Page #303 background image
Six-Month Maintenance
Replace Calcium and Potassium Electrode Tip
UniCel DxC Systems Instructions For Use A13914 Maintenance
October 2005 Page 10-57
10
ISE Service
The ISE service procedure prevents reagent leakage from the flow cell whenever
electrode removal is required.
Step Action
1 Loosen the two Phillips screws (1) on the ISE module cover and lift off
cover.
Figure 10.34
2 Release the locking pin (1) on the ISE module and lift the module until it
clicks. The locking pin is located on the left side of the ISE module on
DxC 800 Systems as shown below. The locking pin is located on the right
side of the ISE module on DxC 600 Systems.
Figure 10.35
(1 of 2)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Beckman Coulter UniCel DxC Synchron 800 and is the answer not in the manual?

Beckman Coulter UniCel DxC Synchron 800 Specifications

General IconGeneral
BrandBeckman Coulter
ModelUniCel DxC Synchron 800
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals