Six-Month Maintenance
Replace Calcium and Potassium Electrode Tip
Maintenance UniCel DxC Systems Instructions For Use A13914
Page 10-58 October 2005
Removing and Installing the Flow Cell Electrodes
This removal and installation process applies to all electrodes housed in the flow cell.
Follow this procedure when removal of an electrode from the flow cell is required.
3 Prevent leakage of reagent from the flow cell by selecting:
• the Utils icon from the menu bar,
• <2> Maintenance,
• <3> ISE Service,
• <Continue>.
The flow cell is prepared for electrode maintenance.
4 Refer to the appropriate electrode procedures for servicing other electrodes
(As-Needed/As-Required Maintenance).
• Chloride Electrode (or Cleaning MC Reagent Lines)
•CO
2
Measuring Electrode (Cleaning MC Reagent Lines)
• Sodium Electrode (Cleaning MC Reagent Lines).
CAUTION
To prevent damage due to electrical static discharge (ESD), wear the wrist
ground strap when performing this procedure. For further instructions, refer
to "Basic Laboratory Practice
" in the beginning of this chapter.
Step Action, continued
(2 of 2)