EasyManua.ls Logo

Bertram 540 - Page 377

Default Icon
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CR
12V
12V
#2/0,RD
N
P
#2/0,RD
12V
12V
100A
CONV.
24V
SERVICE
BATTERY
BANK
POS
NEG
2P2,4/0,RD
2N2,4/0,YL
#4,RD
11-1,#4,RD
2DN-1,#1,YL
11-3,#4,YL
TO BONDING
SYSTEM
BYD 14B4190
#10,YL
100A ANL
60A ANL
#6,RD
12-2,#6,RD
PARALLEL
SOLENOID
#2/0,RD
#2/0,RD
NEG
POS
24V
PORT & STBD
ENGINES BATTERY
BANK
2P1 #4/0,RD
SERVICE MAIN
DISCONNECT
SWITCH
STBD ENGINE MAIN
DISCONNECT SWITCH
GN2-2 ,1/0(YL)
2FN-1,#1,YL
2E1 ,#4/0,RD
2E2 ,#4/0,YL
TO GEN # 2 NEG (SEE SHT 22)
#2,RD
#2,RD
80A ANL
100A ANL
F2
F3
SOL-1,#10,RD
2FP-1,#1,RD
2DP-1,#1,RD
TO FLYBRIDGE
DISTR. PANEL MAIN C.B.
(SEE SHEET 2)
TO SALON PORT 24V
DISTR. PANEL MAIN C.B.
(SEE SHEET 3)
TO SALON DISTR. PANEL
NEGATIVE BUS (SEE SHT 3)
12V & 24V DC MAIN SUPPLY POWER PANEL
F17
F18
F19
7.5A
6A
TO MIDSHIP BILGE PUMP
TO AFT BILGE PUMP
TO FIREBOY MONITOR
1. BONDING CONDUCTOR TO BOXES
#6,GN
TO F/B 24V PANEL NEG BUS
(SEE SHT 2)
24V
24V
2FWN-1,2/0,YL
7.5A
#1/0,RD
F4
DISTR. PANEL MAIN C.B.
TO SALON STBD 24V
2FWP-1,2/0(RD)
100A ANL
TO FWD 24V DISTR.
PANEL NEGATIVE BUS
TO F/B BATTERY PARALLEL
SWITCH (SEE SHEET 8)
REQUIRED.
2. INSTALL #4/0,YL BATTERY CABLE
BETWEEN THE MAIN ENGINE BLOCKS.
(SEE SHT 3)
(SEE SHT 3)
3. YELLOW WIRE USED IN
NEGATIVE CIRCUITS MAY BE REPLACED
WITH BLACK WIRE.
12V
NEG
12V
POS
#2/0,RD
#2/0,RD
#2/0,YL
P
WINDLASS DISC SW & FUSE
2E3 ,#4/0,RD
2E4 ,#4/0,YL
NOTES:
4. STBD ENGINE ALTERNATOR CIRCUITS MUST BE DISCONNECTED
FROM STARTER AND RECONNECTED TO THE SERVICE BATTERY.
HIGH FREQ. CONV. #1
50A
BT-1,#4/0,RD
400A
THE WIRE BETWEEN
THE BATTERY AND
THE FUSE MUST NOT
BE LONGER THAN 72".
BT-3 ,#4/0,YL
BT-2,4/0,RD
DISCONNECT SWITCH
PORT ENGINE MAIN
#2/0,RD
BOW THRUSTER SW.
2N1,4/0,YL
5. THE NEGATIVE SIDE OF THE DC SYSTYEM SHALL BE GROUNDED.
THE PORT AND STBD ENGINE BLOCKS SHALL BE PART OF THE
ELECTRICALLY GROUNDED SYSTEM.
BT-4 #4/0,YL
2W1,#1(RD)
TO STBD ENG.
STARTER NEGATIVE
STARTER NEGATIVE
TO PORT ENG.
TO BOW THRUSTER
TO BOW THRUSTER NEG.
12/24 MAIN SUPPLY
PANEL NEG. BUS
TO PORT ENGINE
STARTER POS.
STARTER POS.
TO STBD ENGINE
GN1-2 1/0(YL)
TO GEN # 1 NEG (SEE SHT 22)
TO FIRE ALARM MONITOR
TO BILGE FLOOD MONITOR
TO GEN ROOM BILGE PUMP
TO FWD BILGE PUMP
6A
F15
6A
F14
7.5A
7.5A
F13
F12
#8,RD
TO WINDLASS NEG.
BELL HOUSING (OPTIONAL)
CONV.
50A
N
P P
HIGH FREQ. CONV. #2
12-3 #6,YL
150A ANL
2A1 #2,RD
ALTERNATOR
TO PORT ENG
#2,RD
GND 12V 24V
VOLTAGE EQUALIZER
60A ANL
1V1 #4,RD
2V-N #6,YL
BE LONGER THAN 72".
THE FUSE MUST NOT
THE BATTERY AND
THE WIRE BETWEEN
60A ANL
2V-P #6,RD
#6,RD
12F-N #1,YL
12F-P #1,RD
TO F/B 12V PANEL
F13
F7
F6
TO GEN. 1 BATT. NEG. (SEE SHT 22)
TO GEN. 2 BATT. NEG. (SEE SHT 22)
GN1 #1,YL
GN2 #1,YL
2W2 #1,YL
F21
F10
F5
(SEE SHEET 7)
(SEE SHEET 8)
(SEE SHEET 4)
(SEE SHEET 5)
(SEE SHEET 6)
(SEE SHEET 4)
(SEE SHEET 5)
(SEE SHEET 9)
#4/0,RD
4/0,RD
4/0,RD
4/0,RD
ENG. BATT POS BUS
SERVICE BATT. POS BUS
SERVICE BATT.
LOAD BUS
SEE FUSE F5.
#8,RD
24V
F20
(SEE SHEET 8)
(OPTIONAL)
(OPTIONAL)
(SEE SHT 8)
MAIN SUPPLY BOX
& PANEL
#2/0,RD
F14
300A ANL
#2/O,RD
(SEE SHEET 25)
TO INVERTER 1
TO INVERTER 1 NEG. (SEE SHT 25)
INV 1 #2/0, BLK
TO INVERTER 2
(SEE SHEET 25)
#2/O,RD
300A ANL
F15
#2/0,RD
INV 2 #2/0, BLK
TO INVERTER 2 NEG. (SEE SHT 25)
Group#
Job Order #
DESIG.BY:
FILE:
DATE:
APPV.BY:
Project
SCALE:
Dwg #
Layout
Dwg #
NONE
Rev.
DRAWING TITLE
MODEL:
DRAWING SIZE:
3663 NW 21 STREET, MIAMI FL. 33142 - USA - tel. (305) 633/8011 - fax (305) 633/7188 - e-mail: info@bertram.com
PROPRIETA’ DELLA FERRETTI ENGINEERING. SENZA AUTORIZZAZIONE SCRITTA DELLA STESSA IL PRESENTE DISEGNO NON POTRA’ ESSERE UTILIZZATO PER LA
COSTRUZIONE DELL’OGGETTO RAPPRESENTATO, NE COMUNICATO A TERZI O RIPRODOTTO. LA SOC. PROPRIETARIA TUTELA I PROPRI DIRITTI A RIGORE DI LEGGE
0
B540_00-3U_IM_93_0
-
93
IM
00/3U
B540
FONTAINE
93
02-07-08
TAV
DC MAIN SUPPLY
540
A
WIRING

Table of Contents

Related product manuals